Site Search

Home
Products
Design Software
Installation
NPDES
Research and Development
Resources
Guarantee
Distributor Locator

Erosion Solutions Specialists
About the Company
Employment
Contact
Site Map
Media
Distributor Login









Installation Logo


Slopes

    Slope Application Installation Video:   
Watch Video Now

Installation instructions in CAD format: .dwg

Installation instructions are also available in PDF format: pdf format PDF Format



1.

Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed.

2. Begin at the top of the slope by anchoring the RECPs in a 6" (15 cm) deep x 6" (15 cm) wide trench with approximately 12" (30 cm) of RECPs extended beyond the up-slope portion of the trench. Anchor the RECPs with a row of staples/stakes approximately 12" (30 cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to compacted soil and fold remaining 12" (30 cm) portion of RECPs back over seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12" (30 cm) apart across the width of the RECPs.
3. Roll the RECPs (a.) down or (b.) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. When using the Dot System™, staples/stakes should be placed through each of the colored dots corresponding to the appropriate staple pattern.
4. The edges of parallel RECPs must be stapled with approximately 2" – 5" (5 cm – 12.5 cm) overlap depending on RECP’s type.
5.

Consecutive RECPs spliced down the slope must be placed end over end (shingle style) with an approximate 3" (7.5 cm) overlap. Staple through overlapped area, approximately 12" (30 cm) apart across entire RECP’s width.

Note: *In loose soil conditions, the use of staple or stake lengths greater than 6" (15 cm) may be necessary to properly secure the RECPs.




Introduction
Fastener Systems
Staple Patterns
Installation Instructions
Slopes
Channels
Shorelines
Special